Scroll Top
What are our prices based on?

Cost calculation depends on the following general parameters:

  • Rough material requested
  • Required process
  • Ordered quantity
  • Material yield factor
  • Delivery time

We keep in stock standard CCL (copper clad laminates):

  • CEM1
  • CEM3
  • CEM3 Thermal
  • FR4
  • MCCL Aluminium base

We have a capacity of 150,000 – 180,000 m2 PCB yearly .

Optimal order quantity depends on your actual demand for particular product.

For cost sensitive products there is always a question present, is it better to buy a risky higher quantity at lower cost or to buy safer smaller batches with a flexible delivery.

There is no general answer, but we are very competitive on the EU market with our flexible deliveries.

We define minimum order quantity (MOQ) in an offer, depends on the requested process and material.

Calculation is based on real production data converted to estimated processing time for each operation.
Software according to all entered values generates estimated production time, similar as google maps calculates your estimated travel time by calculating actual traffic.
Delivery time for mass production is agreed upon order quantity, available material and processing capacities.

  • Processing time for small orders – 5 working days.
  • Processing time for quantities under 50 m2 – 7-10 working days.
  • Delivery time for mass production is agreed upon order quantity, available material and processing capacities.

Most of our materials and process comply with the UL laboratory-based surveillance.

The entire business process is compliant to ISO 14001/2015 environmental management system.

We accept data files formats: Gerber RS274-X, ODB++, HPGL, IPC, Eagle, DXF, …

All our UL listed materials are for US and Canadian market.

The printed circuits boards must be stored in dry and temperature controled storage.

Minimal storage requirements:

  • Temperature: 20 °C (± 5°)
  • Relative moisture: 40 % (± 10%)
  • Recomended maximum storage time for printed circuit boards is
    • 6 months for OSP protection
    • 12 months for HAL lead free protection

The entire business process is compliant to ISO 9001/2015 quality management system

All our products and procedures are compliant with the RoHS and REACH Directives and originate from the EU.